Qualitative design review
introduction
A Qualitative Design Review (QDR) is a technique outlined in BS 7974-0 that allows the team to think of the possible ways in which a fire hazard might arise and establish a range of strategies to maintain the risk at an acceptable level.
When designers are engaged in complex designs, regardless of size, they may find it challenging to meet the obligations of Regulations relating to Fire Safety and allowing for fire fighting provisions. BS7974 advocates the use of QDR as a method to engage stakeholders in communication to mitigate risk.
The BS-9999 [1] t [2] fire can be challenged with other fire test data from studies relevant to the application / Trial Design under consideration.
Establishing objectives leads to discussions of life safety solutions beyond those ‘deemed to satisfy’ life safety solutions into meaningful dialogue for assets, business criticality and management decisions for resourcing and training.
Through QDR, a wide range of stakeholders understand the interdependencies between design and operations, and where emphasis on safety is needed, with a broad input from a holistic range of knowledge, engagement is critical to use the resources available effectively.
The whole building life cycle (e.g. change control, product substitution, emerging information and handover) can all be appropriately interrogated through the QDR process to arrive at acceptable solutions to mitigate hazards.
Pessimistic collaboration
The QDR team should take account of the possibility of failures of protection systems and management procedures when establishing the sequences of events to be considered. In a deterministic or comparative study, it is usual to identify a number of worst-case scenarios for further evaluation.
BS-7974-0
A whole fire event can be modelled, with different fire locations, different protection solutions, different management responses, and may include firefighting operations.
Successful QDRs are workshops, not presentations; they are delivered by team effort, not by adversarial argument; they are constructive, not divisive; they are continual, not disjointed; they are visible, not obscurantist.
QDR provides a useful benchmarking exercise against code, regulations and other requirements and recommendations.
The QDR process is flexible and can be used from feasibility right through detail design, construction safety, operations, maintenance considerations and change of use/end of use and handover.
![]() |
A whole fire event can be modelled, with different fire locations, different protection solutions, different management responses, and may include firefighting operations. |
This article originally appeared as ‘Building a safer future’, in Issue 128 of Architectural Technology Journal, published by The Chartered Institute of Architectural Technologists (CIAT) in Winter 2018-19. It was written by Dr Graham Smith MCIAT.
References:
- [1] Application of fire safety engineering principles to the design of buildings. Code of practice.
- [2] Fire safety in the design, management and use of buildings. Code of practice.
--CIAT
Related articles on Designing Buildings Wiki
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.